5. Facility Needs, City of Livermore

Current Civic Center Library At the time of the bond measure...

  • Built in 1966
  • 15,400 square feet
  • Concrete tilt-up walls with river rocks
  • Built with a $380,00 bond issue passed by 69.9% of voters